The master plan for the full Norwest Quarter precinct for Mulpha, of which Stage 1 is now complete, plans for around 950 homes across up to nine buildings of 8 to 26 storeys.

Insulation
Glazing
Glazing Ratio
Shading
Induction Cooking
Electric Communal BBQs
Rooftop Solar PV
Facade Solar PV
Green Power PPAs
Electric Vehicle Share
Rainwater Re-Use
Recycled Water Re-Use
Efficient Water Fittings
Water Refill Stations
Non-toxic Materials
E-Water Systems
Healthy Fresh Air Guaranteed
Landscaping and Biodiversity
Productive Beehives
Urban Heat Island Effect Minimisation

We worked with an integrated team including Terroir and REALM Studios to push the master plan as far as possible in a cost-effective way, letting the master plan do the heavy lifting with site-wide strategies for energy, water and waste to make it easier for the buildings to minimise their operating costs and impact. With the buildings delivered two at a time, the ambition ramps up with every stage, from a new benchmark in Stage 1 towards a site that gives back. We modelled the whole journey, from minimum compliance to world leading.
Compared with business as usual, the world leading case reduces energy use by 60%, needs no mains water by treating rain, grey and black water on site, and treats more organic waste than it produces by taking in waste from its neighbours. Site running costs fall by around 60%, from $13 million a year to $5 million, and the investment required pays for itself in about 13 years. Every system fits on site, the numbers stack up and the technology is available, so there is no reason not to do it.