This project serves as an example of what mandatory environmental building retrofits in Melbourne could do, creating a precedent which could be easily replicated across existing buildings in Melbourne.

This project serves as an example of what mandatory environmental building retrofits in Melbourne could do, creating a precedent which could be easily replicated across existing buildings in Melbourne.

This project serves as an example of what mandatory environmental building retrofits in Melbourne could do, creating a precedent which could be easily replicated across existing buildings in Melbourne.

architects + collaborators:

architects + collaborators:

architects + collaborators:

Kennedy Nolan, Wilderness Building Co, Resin Property

Kennedy Nolan, Wilderness Building Co, Resin Property

Kennedy Nolan, Wilderness Building Co, Resin Property


awards ↑

awards ↑


awards ↑

client:

client:

Tripple

Tripple

client:

client:

Tripple

Tripple

0039

0039

Wilam Ngarrang

,

apartment housing

built

,

retrofit

0039

built

,

retrofit

This project serves as an example of what mandatory environmental building retrofits in Melbourne could do, creating a precedent which could be easily replicated across existing buildings in Melbourne.

architects + collaborators:

Kennedy Nolan, Wilderness Building Co, Resin Property


awards ↑

client:

Tripple

client:

Tripple

We need to retrofit 1.2 million homes in Greater Melbourne. Could one project help speed things up?

We need to retrofit 1.2 million homes in Greater Melbourne. Could one project help speed things up?

We need to retrofit 1.2 million homes in Greater Melbourne. Could one project help speed things up?

Wilam Ngarrang started as a three-storey, 1970s double-brick walk-up of 15 studio apartments in Fitzroy, a common Melbourne typology: solid, yet uncomfortable and expensive to run, with a car park where the garden should be. Its name means "place to reflect" in Woi Wurrung. Tripple, a social impact investor, asked us what should be done, and our answer was as little as possible: every logical, cost-effective initiative and nothing more. Completed in 2023, it is now all-electric and solar-powered, uses around 70% less energy than the average Melbourne home, and is a physical example of the policy we would like to see.

ENERGY

ENERGY

WATER

WATER

WASTE

WASTE

EMBODIED CARBON

EMBODIED CARBON

  • Roof and wall insulation was added and the airtightness was improved to reduce energy consumption and increase indoor comfort

  • A 33kW rooftop solar system was installed to generate more power than the building consumes each year

  • Windows upgraded to high performance uPVC double glazing

  • Domestic hot water storage allows for hot water created using solar power to be stored for use when the sun isn't shining

  • New VRF heating and cooling system

  • Induction cooktops

  • 7,000L of rainwater storage across two tanks, to be used on the gardens

  • Efficient showers, taps and toilets

  • On-site communal composting to help residents reduce the amount of waste sent to landfill

  • Communal gardens

  • Bike parking

  • Landscape paving and planting

  • Fence upgrades

  • Retained double brick structure

  • Rendered internal wall finish

  • Avoided MDF joinery

  • Cork internal floor finish

  • uPVC double glazing

  • Repurposed existing roof sheeting as fencing

  • Kitchen splashback tiles reused for communal laundry area

  • Salvaged marble used for communal table

  • Salvaged furniture for communal fit-outs

We were the first consultant engaged, working with Tripple on the feasibility study, helping bring together Kennedy Nolan, Resin and Wilderness Building Co, and taking the project from concept through construction into operation, where we still monitor it. We helped Tripple hit its financial return and tuned the environmental performance to match, on both capital and operating costs. With a flat hierarchy and the builder involved from day one, the whole team worked as equals to spend less, knowing every dollar saved went further on performance and on the residents.

Energy consumption

Energy consumption

The graph provides a breakdown of the project costs.

The table provides a breakdown of the costs to retrofit.

The graph outlines living costs under different scenarios.

The table provides a breakdown of the costs to retrofit.

Energy monitoring

Energy monitoring

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People.
We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity