0012

0012

0012

0012

Norwest Quarter, Stage 1

Norwest Quarter, Stage 1

Norwest Quarter, Stage 1

,

,

,

apartment housing

apartment housing

apartment housing

built

built

built

,

,

,

new build

new build

new build

0012

built

,

new build

The first stage of the nine-building Norwest Quarter precinct: two residential towers over a retail podium, designed as an all-electric, zero-carbon-ready community. It’s the first apartment building in Australia to receive CEFC funding.

The first stage of the nine-building Norwest Quarter precinct: two residential towers over a retail podium, designed as an all-electric, zero-carbon-ready community. It’s the first apartment building in Australia to receive CEFC funding.

The first stage of the nine-building Norwest Quarter precinct: two residential towers over a retail podium, designed as an all-electric, zero-carbon-ready community. It’s the first apartment building in Australia to receive CEFC funding.

architects + collaborators:

architects + collaborators:

architects + collaborators:

Bates Smart + Smart Design Studio

Bates Smart + Smart Design Studio

Bates Smart + Smart Design Studio


awards ↑

awards ↑


awards ↑

client:

client:

Mulpha

Mulpha

client:

client:

Mulpha

Mulpha

0012

0012

Norwest Quarter, Stage 1

,

apartment housing

built

,

new build

0012

built

,

new build

The first stage of the nine-building Norwest Quarter precinct: two residential towers over a retail podium, designed as an all-electric, zero-carbon-ready community. It’s the first apartment building in Australia to receive CEFC funding.

architects + collaborators:

Bates Smart + Smart Design Studio


awards ↑

client:

Mulpha

client:

Mulpha

Buyers want lower running costs but don't want to pay more. Can we give them both?

Buyers want lower running costs but don't want to pay more. Can we give them both?

Buyers want lower running costs but don't want to pay more. Can we give them both?

Two apartment buildings at Norwest in Sydney's Hills District for Mulpha, Banksia by Bates Smart and Lacebark by Smart Design Studio, delivered 196 homes in 2025. Buyers wanted lower running costs without paying more, and both buildings were delivered fully electric, ahead of their time, with a level of passive design rarely seen at this scale. Lacebark won the Frederick Romberg Award for Multiple Housing at the 2026 National Architecture Awards.

  • High performance building fabric

    • Wall Insulation R4

    • Glazing Ratio

  • Efficient Lighting and Appliances

    • LED lighting

    • Heat pump dryers

    • Efficient refrigerators, washing machines, dishwashers

  • Induction Cooking

  • Electric Communal BBQs

  • Rooftop Solar PV

  • Heat Pumps for DHW

  • Renewable Energy Imports

  • Centralised water sourced VRF

  • Rainwater Treatment

  • Stormwater Collection

  • Efficient Water Fixtures

  • Minimised DHW dead legs

  • Organic Waste Treatment on-site

  • Zero Waste Apartment Design

  • Construction Waste Avoidance

  • Commercial Tenancy Agreements

  • Non-toxic construction materials

  • E-Water Systems

  • Urban Heat Island Effect Minimisation

    • High percentage of deep soil planting and canopy cover

    • Light coloured materials selected for high reflectivity index

  • Share and repair center

  • Sharing libraries (books, toys, tools)

Environmental design too often arrives late, as an add-on rather than baked in. Here we were the first consultant engaged, before the market research, branding and architects, and ran an environmental feasibility study to shape the brief with Mulpha, so lower running costs were designed in rather than added on.

Our passive design modelling cut uncomfortable hours by around 20%, helped bring window-to-wall ratios down from as high as 88% towards 50%, and set the targets for insulation, glazing, airtightness, natural light, rooftop solar and all-electric services. We also developed the site-wide waste and retail strategies, and tracked every target through to delivery, all without the buildings costing more to build. Pushing well beyond the rest of the industry at the time helped Mulpha secure Clean Energy Finance Corporation funding. Independently verified results show 49% less grid energy, 25% less water and 53% less waste to landfill, with residents' bills around 28% lower.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

If you’re working on a project, a neighbourhood, or a policy where these services matter, we’d like to hear about it.

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People.
We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity

Finding Infinity learns and works on the land of the Wurundjeri Woi Wurrung People. We acknowledge the Traditional Custodians as the first place makers on this land.

privacy policy

© 2026 finding infinity