Powerhouse Ultimo began as the Ultimo Power Station, burning coal from 1899 to run Sydney's trams, and has been home to the Museum of Applied Arts and Sciences since 1988. Its revitalisation conserves the heritage power station halls and the former Ultimo Post Office, turns the museum to face the Goods Line with a new entrance and public square, and adds a new building on Harris Street with workspaces for designers, makers and scientists, growing exhibition space to 7,500 m². The vision behind the winning competition scheme was to bring the building full circle: a power station that once burned coal for the city becoming a producer of energy, water and ideas, a synthesis between Country and culture.

Galleries consume a large amount of energy holding exhibition spaces at precise temperature and humidity to preserve art. The design reduced and isolated those zones, so precise control happens only in thermally separated zones where art is exhibited.
New build high performance glazing
Optimised window to wall ratio
High performance light fittings and appliances
High performance envelope
Optimised efficient zoning and control systems
Maximised Solar PV
Improved airtightness
Improved floor insulation
Passive design strategies
Prioritise the retention or adaptive reuse of existing structural elements.
Maximised reuse of existing materials
Adaptive reuse of existing structures
Low impact materiality
Zero carbon construction
Zero Waste construction

We were part of the Architectus and Durbach Block Jaggers team that won the design competition in 2022, writing the environmental strategy at the heart of the bid. From there we worked through concept and schematic design, carried the strategy into the State Significant Development Application approved in 2025, and supported the project through to the builder being appointed. We shrank the tightly controlled galleries and thermally separated them, so the heritage halls could be sealed, insulated and run in mixed mode, then rejected heat to the harbour, made hot water with heat pumps, maximised solar on the roof and put rainwater and greywater back to work.